Track Record References - Piggyback Pipelay
Smart Band® is an ideal solution for attachment in conjunction with piggyback clamps of the piggyback line to the main pipeline.
Current and past projects where HCL products have been utilised.
COBSCOOK BAY TIDAL ENERGY
VINCENT
ENFIELD PHASE 2
ENFIELD PHASE 1
CHISWICK DEVELOPMENT
- CLIENTS: Technip UK
- INSTALLATION DATE: 2007
- LOCATION: Southern North Sea
- Smart Band® was used by divers to re-attach a 1.5" methanol piggyback line to the 10" gas production line for approximately 100m at each end.
SELECT
Contact Us
UK: +44 (0)1761 417 714
USA: 281 717 1145























