Track Record References - Piggyback Pipelay

Smart® Band is an ideal solution for attachment in conjunction with piggyback clamps of the piggyback line to the main pipeline.

Current and past projects where HCL products have been utilised.

COBSCOOK BAY TIDAL ENERGY
  • CLIENTS: ORPC - Ocean Renewable Power Company
  • INSTALLATION DATE: 2012
  • LOCATION: Cobscook Bay - Maine
  • Smart® Band was used on the TidGen™ Power System for the permanent attachment of cable conduits and also temporary attachment of cable bundles.
  • title
VINCENT
  • CLIENTS: Technip Subsea7 Asia Pacific
  • INSTALLATION DATE: 2007
  • LOCATION: Exmouth - WA
  • Smart® Band was used to secure the Umbilicals with the Smart® Band pneumatic tool.
  • title title title title
CLIFFHEAD
  • CLIENTS: Apache & Rockoil
  • INSTALLATION DATE: 2005
  • LOCATION: Australia
  • title title
ENFIELD PHASE 2
  • CLIENTS: Technip Oceania Pty
  • INSTALLATION DATE: 2009
  • LOCATION: North West Shelf - WA
  • Smart® Band was used to secure the Umbilicals with the Smart® Band pneumatic tool.
  • title title title title title title title title title title title title
ENFIELD PHASE 1
  • CLIENTS: Technip Subsea7 Asia Pacific
  • INSTALLATION DATE: 2007
  • LOCATION: North West Shelf - WA
  • Smart® Band was used to secure the Umbilicals with the Smart® Band pneumatic tool.
  • title title title title
CHISWICK DEVELOPMENT
  • CLIENTS: Technip UK
  • INSTALLATION DATE: 2007
  • LOCATION: Southern North Sea
  • Smart® Band was used by divers to re-attach a 1.5" methanol piggyback line to the 10" gas production line for approximately 100m at each end.

Track Record References – Page 1

SELECT

Contact Us

Contact Us

UK: +44 (0)1761 417 714

USA: 281 717 1145